• Accessibility page
  • Search skiplink
  • Main navigation skiplink
  • Main content skiplink
  • Utility Navigation skiplink
  • Contact NZTA
SmartMovez logo
NZTA logo
  • Give us feedback
  • Site help
  • Site map
  • Outcomes
  • Various topics
  • Activities
  • Planning & funding
  • Data
  • Web tools
  • References
  • About NZTA
Home RAMM treatment selection process 1999

References

  • Planning, programming and funding
  • Economic evaluation
  • Procurement

RAMM treatment selection process 1999

Publication type: Manual

Release date: 01 January 2005

Manual Nos:

Contact:

Last amendment made/date: 17 March 2010

Price: Free

Download PDF (633.1 kb)

Order a copy of the Manual

Download Acrobat Reader

Summary

These notes, published in 1999, were prepared and presented by NZIHT at their RAMM treatment selection workshop (V3.7).

The RAMM Treatment Selection workshop notes provide guidance on the development of the forward works programme for a sealed road network. This is achieved by systematically examining the age and condition of the pavement and seal for individual treatment lengths and then ranking them to achieve a prioritised forward works programme.

RAMM treatment selection workshop v3.7, 1999 (630 KB)

A review of the RAMM treatment selection process was published in 1997. Because it is an old report it is not available to download. Please follow the link to obtain a hard-copy for a nominal charge.

  • Give us feedback
  • Site help
  • Site map
  • NZ Transport Agency website
  • © Copyright
  • Disclaimer
New Zealand government logoSustainability logo