EEM1 (road infrastructure) Ch 5 Full procedures for project evaluation
Summary
Chapter 5 describes procedures and provides sample worksheets for full economic efficiency evaluation of land transport projects. The full procedures are to be used when either more detailed analysis is required than is provided in the simplified procedures, or the limits specified for the simplified procedures are exceeded.
- 5.1 Overview
- 5.2 Application of full procedures
- 5.3 Stages of analysis
- 5.4 Project feasability report
- Worksheet 1: Evaluation summary
- Worksheet 2: Summary of benefits and goods
- Worksheet 3: Benefit cost analysis
- Worksheet 4: Incremental analysis
- Worksheet 5: First year rate of return
- Worksheet 6: Sensitivity analysis
- Worksheet 7: Checklist for project evaluations
- Worksheets 8: Transport modelling checks
- Worksheets A1: Discounting and update factors
- Worksheets A2: Traffic data
- Worksheets A3: Travel time estimation
- Worksheets A4: Travel time cost savings
- Worksheets A5: Vehicle operating cost savings
- Worksheets A6: Accident cost savings
- Worksheets A7: Vehicle passing options
- Worksheets A8: External impacts
- Worksheets A9: Vehicle emissions
- Worksheets A10: National strategic factors
- Worksheets A13: Risk analysis
5.1 Overview
Introduction
This chapter describes the procedures and provides worksheets for full economic efficiency evaluation of land transport projects submitted to Land Transport NZ for funding.