8.4 - Cost benefit evaluation
8.4 - Cost benefit evaluation
Simplified procedure
Simplified procedure 11 provides a standard procedure with worksheets for evaluating the economic efficiency of walking and cycling projects with the exception of signalised crossings over roads.
